Manjimup Timber and Heritage Park Revitalisation
Component summary
The transformational redevelopment of the Manjimup Timber and Heritage Park (MTHP) precinct includes the following:
This component is compete, the final component to be completed for stage two which has seen the MTHP precinct transformed into a unique multipurpose attraction. This component also required partner funding from both the State and Federal Government, as well as a substantial financial contribution from the Shire.
The various elements of this project are detailed below:
- The construction and fit out of the Power Up Electricity Museum (South West Energy Experience, formerly the World of Energy collection);
- Roads, drainage and pathways;
- Landscaping, services, lighting and interpretation;
- Existing building refurbishment;
- Sound shell; and
- Conferencing facilities.
- Creation of a new entry point and cafe building;
- Relocation and upgrade of the existing Timber Museum;
- Inclusion and integration of the South West Energy Experience (State energy heritage collection supplied by South West Development Commission as a contribution to the project);
- Conferencing facilities;
- Function facilities;
- Agricultural static display areas;
- Indigenous exhibit area;
- Historical and cultural static and dynamic display areas;
- Community garden;
- Recreational facilities;
- Landscaping works; and
- A range of infrastructure improvements.
View the Manjimup Timber and Heritage Park Concept Design for further information.
View the Interpretation Plan and Exhibition Design here.
This project is now complete.
Visit the Manjimup Heritage Park website here.
State Timber Museum
The project is complete and the State Timber Museum was officially re-opened to the public on 9 August 2018 by the Hon. Paul Omodei, Manjimup Shire President.
Volunteer Hub
The Old Saw Mill Display has been converted into a new Community Volunteer Hub. Designed by Bachos Building Design with the construction tender awarded to James Ryan Builder. The build is complete and the workshop fit out is complete.
The building was officially opened by the Hon Adele Farina MLA on 20 April 2018.
A LotteryWest Grant was secured for the fit out which is now complete.
Historic Hamlet
Hamlet Access Ramps
The historic hamlet accessibility project was extended to the Doctor's Surgery and Settler's Cottage - this project is now complete, and was officially opened on 20 April 2018.
Hamlet Extension - Blacksmith Shop
Designed by D'Entrecasteaux Drafting and Design. build completed by James Ryan Builders, practical completion has been reached. Interpretive design and fit out awarded to Creative Spaces. Exhibition fit out is complete.
Hamlet Extension - Agricultural Display
Designed by D'Entrecasteaux Drafting and Design.
Construction commenced late November 2017.
Construction commenced late November 2017.
Practical completion has been reached.
Exhibition fit out is complete.
Sandra Donovan Sound Shell
The Sandra Donovan Sound Shell was completed in February 2018. An opening ceremony and concert was held on Friday 20 April 2018 at which the sound shell was officially opened by the Hon Adele Farina MLA.
Rail and Relics
The Manjimup Men's Shed have undertaken restoration works on the rail carriages.
Sandblasting and repainting of the locomotive and steam hauler (Willamette) is complete.
The locomotive and steam hauler have been relocated to their new position on the disused rail corridor.
The Department of Biodiversity, Conservation and Attractions (DBCA) donated some logs and earth works to complete the log landing formation.
Wellness and Respite Community Centre
Architectural design completed in 2016. Construction contract awarded to TDC 2017.
Practial completion issued on Friday 20 April 2018.
Manjimup Home and Community Care have moved into the new building.
Landscaping complete.
Power Up Electricty Museum (South West Energy Experience - SWEE)
The South West Energy Experience (SWEE) is a multipurpose facility which incorporates a new bespoke museum, caf and visitor servicing centre. It is a core component of the revitalisation of Manjimup's town centre, contributing to the transformation of the Manjimup Heritage Park into a regional tourism precinct and central community hub. The location and the unique contemporary design of the building will become the new gateway to Manjimup, enticing visitors to the Park and further into the centre of Manjimup.
The museum showcases the heritage of energy (past, present and future) inclusive of the Western Australia World of Energy collection, through modern exhibitions, engaging displays and interactive building features. The museum encompasses educational and interpretative experiences sought by local, regional, national and international visitors alike. The caf has replaced the existing aged caf in the park and the visitor servicing centre is a new point of contact for visitors to the park, town and greater region.
The tender for construction was awarded to Civilcon. Site works commenced on 29 October 2018 and continued until late 2019 with an opening in December 2019. A sod turning ceremony was held on 5th November 2018.
The Power Up Museum, Visitor Centre and PARK Cafe were all opened in December 2019.
Adventure playground
The adventure was opened for play, just in time for the September 2013 school holidays.
The playground has been designed to be used by children of all ages with varying levels of ability. The equipment features custom made structures such as a large climbing net, 40m double cable flying fox, water play, cubbies, slides, rides and sculptures of our local animals.
There is also outdoor gym equipment, barbecues and picnic spots, so families can enjoy a complete recreational experience.
The most recent addition to the park is a 17 metre high lookout, with a giant tubular slide exiting from 11 metres high. The lookout is in line with the old decommissioned fire tower, also located at the park, and offers 360 degree views of the surrounding area.
History House
History House was completed and handed over to the Manjimup Historical Society in October 2013.
The acquisition of a commercial property abutting the park was completed in late 2013 and all buildings were subsequently removed. This area will be integrated into the park as part of the linkage to South Western Highway. See component one for further information including details of the closure of a portion of Giblett Street which will be incorporated into the park and the creation of a new northern town site access which will make the MTHP the entry statement.
Security
A series of CCTV cameras have been installed accross the park, with direct linkage to the Manjimup Police Station.
Furniture
The Shire have installed a number of new bench seats and bins to furnish across the park including a new fully accessible barbeque area.
Interpretation Plan
Installation of signage has been completed.
Roads and Paths
New service access road complete.
Main access path works are complete.
New accessible pathway and boardwalk to hamlet buildings completed.